September 27, 2005
Final concrete to be poured today

A cement slab from 6 to 10 cm thick will cover the 2nd and 3rd floors. Although it's a metal frame structure I didn't realize so much concrete was being used. I did a walk around today with the contractor indicating where I wanted the floor electrical outlets (10 total). Jean-Paul once mentioned, many years ago, how a conference center (or hotel) had done so on a whim and how useful it was during events. With using laptops, projectors, etc. during class it will definately come in useful.